top of page
Image by Jason Jarrach

Our Work

Glacier Place Tree Removal

This project focused on the safe removal of an unwanted tree from the property, which included cutting it down and disposing of all limbs and debris responsibly. Our team left the area clean and organized, ensuring minimal disruption to the landscape. We prioritized safety and efficiency every step of the way.

IMG_2617.jpeg

Lupine Water Service

This project involved the excavation, installation, and backfilling of an 800-foot water line service in Powell Butte. 

IMG_2624.jpeg

Horse Ridge Frontage Dig Out

Foundation excavation for a small house pad. 

After Photo - Sinclair Job.jpg

RVan Adventures Parking Area

Subgrade parking area, laid and compacted 3/4" State Spec for long term RV and fleet parking.

IMG_1527.jpg

Avion Water Bear Creek Roundabout

Install 8" Waterline For Bear Creek Roundabout Utility Improvements.

IMG_0020.heic

Hahlen Road Department Culvert 

We have replaced several culverts for the Hahlen Road Department in Powell Butte. One of the replacements was on Sego Lilly, where we excavated and installed an 18-inch culvert, spread 3/4-inch gravel, and removed excess material from the drainage ditch for export.

IMG_2625.jpeg

Redmond Parking Lot Grading

This project involved the subgrading of a new parking lot, ensuring a solid foundation for optimal drainage and stability. We laid down 3/4" gravel, followed by compaction to create a durable and reliable surface. This process not only enhances the parking area’s functionality but also contributes to its longevity.

IMG_2621.jpeg

Stillman & Riggs Road

2" Water Trap & Services

IMG_0248.heic

Quinn Residence

Property Improvements For Home Addition.

IMG_0131.heic

Lafayette ADU

Foundation Excavation for ADU

IMG_0062.heic
bottom of page